Why is protecting equipment from air and surface contamination important?

An average minute of data center downtime costs $8,851

80% of data center managers say their last outage was preventable.

70% of data center failures are caused by human error.

74% of data managers believe their last outage of$1M or more could have been prevented with beer processes, management, or configuration.

Your data center isn鈥檛 average. Upgraded procedures protect on three fronts:

  1. Control All Entry Points toKeep Contamination Out:
  • Use double sets of doors
  • Seal the envelope - Keep out particles, cut energy cost of cooled air loss
  • Install entryway maing
  • Restrict operations and materials - All assembly or unpacking should happen in staging areas outside the data center
  1. Control What鈥檚 AlreadyMade It Inside:
  • Empty all trash receptacles daily
  • Target all entryway floors for vacuuming
  • Use strict SOPs for tools and cleaning patterns - Micro and macroscopic protocols. Use cleaning products approved fordata center equipment
  • Subfloor plenums and drop ceilings decontaminated
  • Monitor humidity levels
  1. Control the Equipment that ControlsYour Environment:
  • Change cooling system filters on schedule
  • Clean ducts and airways on schedule to avoid buildup
  • Maintain systems mechanically - Stop particles created by wear and tear

Particular Problems:

  • Air pollution
  • Dirt and dust
  • Electrostatic dust
  • Ferrous metal particles
  • Fibers
  • Human hair
  • Lint
  • Packing materials
  • Pollen
  • Salt (sea or de-icing)
  • Skin particles
  • Zinc (and tin) whiskers

All your operations and equipment affect each other.

  • Particulates in HVAC system scan increase cooling energy costs.EPA recommends removing contaminants to reduce energy use.
  • Airborne gases can also lead to corrosion and failures. ASHRAE recommends data center.
  • Particles and build up can interfere with critical equipment and cause failures. ASHRAE recommends ISO Class 8clean room requirements for data centers.